top of page
East 3rd Street Before During 1
East 3rd Street Before During 2
East 3rd Street Before During 3
East 3rd Street Before During 1
1/3
MANHATTAN
EAST 3RD STREET BEFORE/DURING
This project involved the reallocation of space between bedrooms to allow for the installation of a spacious walk-in closet in the master suite. Bathroom tile was installed flush with sheetrock to create a continuity between materials. This Ikea-Hack kitchen features a geometric tile backsplash and was designed for a NYC restaurant chef.
bottom of page